mirror of
https://github.com/dong-nz/cv.git
synced 2026-11-22 16:10:40 +07:00
1.6 KiB
1.6 KiB
Specification — v2 Features
Document:
spec-v2.mdVersion: 0.1.0 Status: Draft — awaiting review Branch:dev_v2Parent branch:dev(v0.0.1)
Prerequisites (Completed)
| File | Feature | Status |
|---|---|---|
specs/v2/spec-v2-router.md |
React Router v6 → v7 | ✅ Done |
specs/v2/spec-v2-router-v8.md |
React Router v7 → v8 | ✅ Done |
Overview
v2 bao gồm 6 tính năng, mỗi tính năng có spec riêng trong specs/:
| File | Feature | Priority | Est. | Status |
|---|---|---|---|---|
specs/v2/spec-v2-resume.md |
Resume download | P1 | ~15 min | ✅ Done |
specs/v2/spec-v2-hero-carousel.md |
Hero visual carousel | P1 | ~1 hour | |
specs/v2/spec-v2-seo.md |
SEO (metadata, OG, sitemap) | P1 | ~1 hour | |
specs/v2/spec-v2-blog.md |
Blog (MDX, articles, syntax highlight) | P1 | ~4 hours | |
specs/v2/spec-v2-analytics.md |
Analytics (Plausible) | P2 | ~30 min | |
specs/v2/spec-v2-testing.md |
Testing (Vitest + E2E) | P5 | ~3 hours | |
specs/v2/spec-v2-cicd.md |
CI/CD (GitHub Actions) | P5 | ~1 hour |
Implementation order: Resume → Hero Carousel → SEO → Blog → Analytics → Testing → CI/CD
Out of Scope (v2)
- CMS integration (Phase 5+)
- Multi-language / i18n (Phase 5+)
- Interactive diagrams / simulations (Phase 5+)
- Search functionality (Phase 5+)
- Contact form with backend (Phase 5+)
- Resume PDF generation (user uploads manually)
Approval
- All requirements reviewed and confirmed
- Implementation order agreed
- Ready to start coding